The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.

Expedited order for Precision M4400 - 48 Hours Production Time ???

Discussion in 'Dell Latitude, Vostro, and Precision' started by brosen, Nov 18, 2008.

Thread Status:
Not open for further replies.
  1. brosen

    brosen Guest

    Reputations:
    0
    Messages:
    159
    Likes Received:
    0
    Trophy Points:
    0
    I bought a Precision M4400, Dell rep said it will be an expedited order, that based on his experience takes 48 hours the production process, any feedback on that ?, any previous experience with expedite orders ?, it's a true statement the 2 days production time ?, thanks
     
  2. afhstingray

    afhstingray Notebook Prophet

    Reputations:
    351
    Messages:
    4,662
    Likes Received:
    2
    Trophy Points:
    105
    yea mine was delivered on 3 days from order. so for example i ordered today, and it arrived two days later. but then again i bought mine in malaysia, and for the APAC region they're made in malaysia...but transport is ground transport, not air like for example aussie orders
     
  3. litkaj

    litkaj Notebook Consultant

    Reputations:
    77
    Messages:
    194
    Likes Received:
    0
    Trophy Points:
    30
    My original E4200 (order placed day of release) took about a month to be delivered (Next Day shipping). The replacement I got was "expedited" by an engineer (not a normal tech) and was delivered in 4 business days from when the order was placed.

    If they want to they can stick you at the head of the line.
     
  4. afhstingray

    afhstingray Notebook Prophet

    Reputations:
    351
    Messages:
    4,662
    Likes Received:
    2
    Trophy Points:
    105
    i travel a lot between the far east and europe, several months in each location. i normally make my laptop purchases in malaysia, in early january about a week before im due to depart back to europe.

    basically they can get it to you in 3 days if you mention you're travelling, it always worked for me. but even the standard shipping time is 2 weeks from the malaysian factory. i wonder why other locations takes so long?
     
Loading...
Thread Status:
Not open for further replies.

Share This Page