The Notebook Review forums were hosted by TechTarget, who shut down them down on January 31, 2022. This static read-only archive was pulled by NBR forum users between January 20 and January 31, 2022, in an effort to make sure that the valuable technical information that had been posted on the forums is preserved. For current discussions, many NBR forum users moved over to NotebookTalk.net after the shutdown.
Problems? See this thread at archive.org.

    GentechPC turnaround time responses and builds

    Discussion in 'Reseller Feedback Forum' started by Signum80, Dec 13, 2019.

  1. Signum80

    Signum80 Newbie

    Reputations:
    0
    Messages:
    1
    Likes Received:
    0
    Trophy Points:
    5
    Was curious on what the turnaround time for responses and builds were for clevo models from those who have ordered from GentechPC just to get an idea of how long it usually takes to figure out my next steps (getting a bit concerned as much as standard build states 5~10 days). Read a few posts on here with mentions of it taking a month before their unit shipped and have sent a few emails but haven't gotten a response in trying to get an update. (Am aware that some parts will take longer than others to get for customized laptops and may be on backorder for parts but would at least like to get an idea of what's going on. @Kevin@GenTechPC / @GenTechPC )

    Edit: Thanks Ken for the follow up
     
    Last edited: Dec 16, 2019