ordered a new inspirion E1705 on 8/23 it still shows as processing estimated ship date of 8/31, is this a normal time frame for the e1705 its a plain jane machine 1.83 core duo, 120 Gb Hd, ati x1400, 1 gB 667Mhz ram really need this sooner as my desktop died this weekend
-
-
Yes this is a normal time frame. Usually takes about a week
-
yes 7-12 days is the norm -
if you check your order status on their website at one point it will look like its stalled out at "boxing"
it's not abnormal, you laptop is assembled overseas and then shipped to texas where it is boxed up for you. if oyu search around you should be able to find what your laptop actually goes through when you order it. pretty cool read actually. -
my estimated shipping date is Sept 13
-
Yea... ordered mine on the 28th... it isn't supposed to ship until the 13th. The guy told me it would be here "on or before the 14th." Let's see if that actually happens. What sucks is that it's still in the "pre-production" phase, but I'm guessing the wait has to do with the core 2 duo cpu.
T7200 (4MB/2.00GHz/667MHz)
256MB NVIDIA GeForce Go 7900 GS
2 Gigs of 533
100GB 7200RPM HDD
This thing's going to scream bloody murder when I get it though. -
i don't think they have the Core2duo's yet...(or not shipping yet ) I ordered a 9400 with a core duo on 24th, and i got it on 1st of september...
-
seems they take their tme with shipping, will be 2 weeks by time i get mine.
-
-
Well, 2 days later and it's already built. The only things left are testing (loading it up with crapware), boxing, shipping prep, and shipping. Still says it'll ship on the 13, but hopefully it'll leave a bit sooner so I can get it in time for school (having the parents drive it down is kinda lame).
-
How long does production usually take?
dL -
My production up to boxing was completed all in one day. I hear boxing takes around 3 days. So my estimate is about 4 days in production phase
-
-
did you two order dual core 2 processors?
-
-
-
you guys are so lucky
i ordered mine on sept 7th, and estimated shipping date is sept 25
that's 18 days!!!!
and it's not even t7600, just a t7200 -
i got mine 2 weeks after i ordered it, not happy but nothign i could do. worht the wait however
-
you have no idea how much PAIN i suffered to order mine
it was pure hell
dell sales customer support for home is HORRIBLE
like satan and hitler and stalin all mixed into one.
and i'd like to see anyone top my 18 day wait -
i ordered mine online, i hate dealing with people
-
Does anyone have the link to the detailed description of Dell's laptop build process?
Dell Order Process
Discussion in 'Dell' started by rllngthndr, Aug 29, 2006.