I ordered a vostro 1500 (performance package) last night. The estd. shipping date is 8/9/07. Why is it taking that long to build a vostro? Did anybody order before and have their notebook shipped already? The order status says " production stage". I guess that the production takes no more than 10 days.
-
It must be an error...
I ordered my Vostro today, and they say that it arrives on 03/08/07. -
Whoa, Lenovo has been hiding their time machine! I wonder where they get the flux capacitor...
-
-
I have no idea why it would take that long to get it ready.
i ordered mine monday night and it said it should be here 8/7/07
kind of a long wait -
No one has received it. I think the best anyone has right now is in-production. I bought mine 7 days ago and its still in pre-production.
-
mine went into build yesterday
-
-
Immediately after I placed the order, the order status said " Production". How will that be possible?
-
-
I ordered the 1500 literally 10 minutes after it went live, and as of yesterday, the laptop was still in Pre-Production. So you'll probably be waiting a while.
-
Still in Pre-Production :/.
-
OH MY GOD !!!!!!!! I just received my VOSTRO 1400!!! wooohooooo!!!!!!
NOT .....
Still in production ( -
in production as well, probably gonna get it by the end of the week
-
I ordered yesterday around noon. Apparently they're already in the build stage, but the estimated shipping date is still August 8.
-
im afraid to call, ill be to pissed if i hear pre production again
-
Ordered 7/10 and mine just went into build. Woot!
-
Since the Vostro can ship with Windows Xp...which means it needs the XP drivers to work...will Dell put up all of the the windows xp drivers on the website soon!?!? I need them badly for inspiron 1520...
-
LMAO, you guys think the build stage only lasts no more then 10 days. That's ate up. My laptop went into build stage on June 29th and has been there since.
-
-
-
it was in pre-production maybe a couple hours, then by 2 am on the 29th in went into build stage and I just received a phone call my laptop has been delayed YET AGAIN. God, I am so sick of Dell at this point. Not going to elaborate here, check other posts if you wanna know why.
-
-
-
deltafx1942 Notebook Consultant NBR Reviewer
i have a theory here: dell might have opened up the orders early to see how much traffic (or better put, how many orders) they can be expecting for the new models, and then ordering parts accordingly so they won't have one particular part over stocked if no one wants it. they can also then adjust options/prices to meet demand.
this is just a theory to why ship times have been so long. -
I called and spoke with a very nice rep and I asked her to explain the process and why it takes 30 days to get a laptop to my door. She checked into it and she said as of right now there is no shortage of anything on my order and everything is in stock. She couldn't explain why it's been 'pre production' for 7 days. But she also said I should receive my order much sooner than aug 7th. I sure hope she's right.
-
just got a call from Dell.
they were just calling to tell me that my dell is going into "production" tomorrow. Does that mean they start building it? lol. -
I dont know if this matters but for my replacement 1520 they told me there is a shortage on the 1280 x 800 lcd panels . Mine was supposed to be shipped out today but hasnt.
So take that with a grain of salt. -
-
Phone order status says "Pre production stage". But the dell online order status states " In Production". Which is true? Are vostros assembled in the U.S. or China?
-
The phone, and they're assembled in Malaysia.
-
Woohoo my Vostro is in the build stage now.
-
^^lucky, what day did you order?
-
Wow you guy's suck, mines still in pre-production for some reason.
-
Mines in build. We ordered last thursday.
-
Jesus, what the hell's wrong with my order then? Is Dell like, Methodis racist?
-
-
Hah, if the Methodist are Methodis racist!
-
His screen name is methodis , but anyways I ordered on the 13th, and mine went into production on the 16th i think, maybe the 15th
-
Mine is in production now. Ship date remains the same as 08/07
-
Wow, I ordered mine on Tuesday and it was in build by early morning Wednesday. I must be lucky...
-
Mine just went to build yesterday...
-
Must....resist....hulk.....powers...
-
Just came back from going all Hulk on Dell's headquarters, my showment of my amazing skills forced them to put my order into "Build". HULK SMASH!
-
-
I keep saying this. Build is the stage where all the orders are getting delayed.
They are having supply problems with the lcd panels . -
W00T! My Vostro went from pre-production to in production somewhere between 9:30 am EST and 10:31 am EST!!!!!!!
I ordered it on the night of July 12, so it took a little less than a week to go from pre-production to in production. Now lets hope production doesn't take too long. -
mine just went "in production" is that the same as the in build stage? how long should this take? my estimated shipping is 8/9/07 and i just recently ordered it.
-
imo the "build" stage probably doesn't even mean its being built yet. just that its in queue to be built, and if they don't have your screen you'll stay in built stage until it comes in.
-
Blaah... 3 days in pre-production now. ETA is 070803 which is August 3 for you non-Swedes
Anyone got their vostro?
Discussion in 'Dell' started by coolguy, Jul 18, 2007.